The campus wedding case of operation management

Because on January 30 Connor, who is in the National Guard, will be shipping out overseas. I want Jane Summers to be my maid of honor.

Can the wedding still take place on January 21? I could spend a day and do that. Can I wear your wedding dress, Mom? If we let them go any later, some of the relatives would get theirs too late to come and that would make them mad. That will be elegant.

If we did all the sewing we could finish the dresses in 11 days. The pattern for the dress would need to be chosen first and then the material. After reading and analysing the case, a total number of 20 activities were found, the activities ranged from the church reservation to the actual wedding.

Chapter 9 Reducing Project Duration Mom: Using a yellow sticky approach see p. The activity chart from given conversation is as given below: The pattern needs to be chosen first, and that would take 3 days.

We need to get gifts for the bridesmaids. It would take her 10 days to get ready and drive up here. We want a week for a honeymoon. Everything should be ready rehearsal night. Browse hundreds of Operations Management tutors.

We must have rehearsal the night before the wedding. We can start each of the relatives on a different job. The lace and dress material are lost in transit. After designating a letter to each activity an immediate precedence was needed for each.

Notice of the loss is received on January Since Lauren was adamant on having the wedding on January 21 as was Connor for obvious reasonsthe implications of each of these complications had to be assessed. That has to be done before we can start decorating, which takes 3 days.

Mother comes down with the three-day flu as she starts work on the guest list January 2. Mary states in the case that the gifts for the bridesmaids need to be ready for the rehearsal night and the maid of honour needs to be present by then. Before we can even start to write out those invitations we need a guest list.

If not to what options are available? These activities include the decoration The first activity is? It takes 8 days to order and receive the material.

Jacks, use airfreight, or anything like that. She is very good too.

It would take another 2 days to do the final fitting and 2 more days to clean and press the dresses. After this it needs to be sewed for the final fitting and taken to be pressed and cleaned before the wedding date. Create a schedule for the wedding using MS Project.

Jacks to work on the dresses.Wedding Case Analysis Operations Management April 25, Hostetler | Lewis | Panutsos | Zhao | Yang MBA Team 2.

I'm having a hard time with the Campus Wedding A & B Case A: 1.

Given the activities and precedence relationships described in the (A) case, develop a network diagram for the wedding plans. 2. Identify the paths, which are critical? 3. What is the minimum-cost plan that meets the April 22 date? Case B: 1.

January 20 for the “Now” Wedding rehearsal. Since Lauren was adamant on having the wedding on January 21 (as was Connor for obvious reasons), the implications of each of these complications had to be assessed%(1).

The Campus Wedding Introduction DSM Description In order to solve the Campus Wedding Case Study, the Critical Path Method network-planning model was used.

The Critical Path Method is a procedure for scheduling a project in which activity times are known so single time estimates are used. Campus Wedding Final - Free download as Powerpoint Presentation .ppt), PDF File .pdf), Text File .txt) or view presentation slides online.

Recent Topics

Scribd is the world's largest social reading and publishing site.5/5(3). The Campus Wedding Case Project Network PATH 1: Reserve Church (1) – Church Notice (17) – Decorate Church (3) – Wedding (1) -- length 22 days. PATH 2: Choose Cake (2) – Jack’s Catering (10) – Rehearsal Dinner (1) – Wedding (1) – length 14 days.

PATH 3: Get Gifts (1) – Rehearsal Dinner (1) – Wedding (1) – length 3 days.